moulavi bazar
Yas Marina produces natural gas from the Moulavi Bazar gas field in Block 14. The field is situated in Kamalganj of Moulavibazar district. First production from Moulavi Bazar started in March 2005. Currently it has 4 producing wells.
1995 | PSC signed
1999 | Field discovered
2005 | First gas
2008 | 3D seismic survey completed
2012 | First production from two new wells drilled
2022 | Extension of PSC, production period for to enable continued production