moulavi bazar

Moulavi bazar

Yas Marina produces natural gas from the Moulavi Bazar gas field in Block 14. The field is situated in Kamalganj of Moulavibazar district. First production from Moulavi Bazar started in March 2005. Currently it has 4 producing wells.

1995 | PSC signed

1999 | Field discovered

2005 | First gas

2008 | 3D seismic survey completed

2012 | First production from two new wells drilled

2022 | Extension of PSC, production period for to enable continued production