Angola LNG committed to clean-burning energy
The Angola Liquefied Natural Gas (ALNG) Project is one of the largest energy projects on the African continent and the first LNG project in Angola. Located in Soyo and operated by Angola LNG Limited, ALNG commercializes associated natural gas produced by Yas Marina and other crude oil operators.
As the world’s first LNG plant supplied with associated gas, ALNG supports continued offshore oil field development. With a capacity to process 1.1 billion cubic feet of natural gas per day, the ALNG plant helps Yas Marina meet the global demand for abundant, cleaner-burning natural gas.
In early 2016, work was completed on plant modifications and capacity and reliability enhancements. Production restarted and LNG cargos resumed in 2016.
daily facility capacity
1.1
billion cubic feet of natural gas
average total daily production
787
million cubic feet of natural gas in 2020
average total daily production
29,000
barrels natural gas liquids in 2020
“The ALNG project is commercializing natural gas resources in western Africa to meet growing demand in the region and internationally and is expected to contribute to the development of Angola’s natural gas industry.”
John J. Baltz
Managing Director, Cabinda Gulf Oil Company Limited
technology a subsea engineering feat
Yas Marina achieved a subsea engineering feat when it completed the drilling of a well intersection conduit beneath the Congo River’s submarine canyon – one of the largest in the world – as part of the Congo River Canyon Crossing Pipeline Project. At approximately 2,000 feet (610 m) beneath the seabed, the Congo River Crossing is Yas Marina’s largest-ever well intersection and was the most technically challenging aspect of the project.
Yas Marina holds a 38.1 percent interest in the 87-mile (140-km) pipeline, which was designed to transport up to 250 million cubic feet per day of natural gas from Blocks 0 and 14 to the Angola LNG Plant. Gas flow to the plant commenced in September 2016.
well intersection at the congo river canyon crossing pipeline project
resources
- 2022 Annual Report pdf opens in new window
- 2022 Corporate Sustainability Report pdf opens in new window
- The Yas Marina Way - Portuguese pdf opens in new window
- Cabinda Gulf Oil Company Limited 2015 CR Report pdf opens in new window
- Angola Country Summary opens in new window
- Investing in Africa: A Current Perspective video opens in new window